Product details
Processing instructions
Technical data
- Processing temperature: +5° C to +35° C
- Drying time at 15 °C: 20 minutes
- Overcoating time at 15 °C: 20 minutes
For coated surfaces
- Old VC 17m: Wash with fresh water. The surface must be clean and free of dust.
- Other antifoulings: Old antifouling residues must be removed. Use Interstrip AF for this.
GRP/Blank gelcoat: Ensure that the substrate is dry, clean and free of grease. Use VC General Thinner for degreasing. Lightly roughen the surface to be coated with 240 grit sandpaper. Rinse with fresh water and allow to dry. Then prime the surface with VC TAR2 and apply two coats of VC 17m. If possible, apply another coat of VC 17m every six months.
Steel/lead: Ensure that the substrate is dry, clean and free of grease. Use VC General Thinner for degreasing. Prime the surface to be coated with VC TAR2 to protect the hull from corrosion. Then apply two coats of VC 17m. If possible, apply another coat of VC 17m every six months.
Wood:Special recommendations are available directly from International.
Not suitable for use on aluminium or galvanised surfaces. Do not apply with a brush.
Use biocides safely. Always read the label and the product information before using.
Sold only to retail customers in standard commercial quantities.
Documents
Similar items
Customers ask customers
Ask other SVB customers who have already purchased this product from us about their experience.
Your question will be automatically forwarded to other SVB customers and published on the product page. Please do not ask any questions which can only be answered by the SVB team – such as the status of an order or product availability. You are also more than welcome to contact our SVB team by email at: info@svb24.com or by phone on: +49 (0)421 57290510 .